homeicon products hardwarelink orbitlockset entracegripset leaverlockset deadlocks doorpulls accessories tapware flooring opshoplink contactus shoppingcart conditions of sale
Flooring

  
  
1.External knots being removed     2. Bamboo pole is sized and stripped.    3. Knots and exterior skin being removed from strip.     4. Strip being kiln abd dry.     5. Strips are laminated together and compressed in three layers.

RECOMMEDED METHOD OF FIXING
CONCRETE:
The flooring can be laid directly onto a levelled and providing it has been ground to a satisfactory surface, or to be sand blasted (levelled concrete surface), then apply adhesive ROBERTS 600.

Alternatively, lay a sub-base with 7mm ply wood or particle board by using ROBERTS 600 and concrete nail, then use hidden nailing system and ROBERTS 600 to fix the flooring.

In most case, after dust free the concrete surface (levelled), the adhesive ROBERTS 600 can be apply directly with a 3mm "V" notched trowel, then place the Bamboo flooring with care.

PARTICLE BOARD:

The Bamboo flooring can be nailed directly onto a prepared particleboard floor by using ROBERTS 600 and hidden nailing system.

JOISTS:

The Bamboo flooring can be hidden nailed directly onto floor joists at 400mm centres (accurately). This method of fixing must follow with extreme care of protecting the flooring during construction.

Note: The products on this page can be ordered either by specifying on the trade enquiries page, and one of our staff will get back to you. Otherwise, please call our contact number and we can negotiate an appropriate deal with a suitable package that suits your needs.
Condor International Limited
1 Cuthill Close, Albany, NSC 0632
North Shore City, New Zealand
Telephone: 64 9 415 8083 or 64 27 4863611 Facsimile:64 9 4158084.
E-mail: info@condor.co.nz